Should I retain the front house or demolish it?
Compare both complete site plans before choosing. Retention may avoid replacing a usable house, but it can constrain access, setbacks, servicing and the rear layout. Ask for a condition assessment and a priced renovation scope, then assess the retained home on its smaller finished lot. The decision should include the cost of adapting that home, not just the saving from avoiding demolition.
Link to this answer · 01Why check side access before choosing a backyard floor plan?
Access determines how the finished dwelling and the construction site can function. Record the clear width, eaves, downpipes, meters, trees, gradients and turning space, rather than measuring fence to wall once. The designer must assess the required permanent access, while the builder checks deliveries and equipment. A route that accommodates a person is not evidence that a module, crane or concrete truck can use it.
Link to this answer · 02Does the quoted building area include the carport?
It depends on the area schedule in the quote. Ask for separate internal living, garage or carport, porch and other covered areas, with the measurement basis shown. A headline square-metre rate is not comparable when one proposal includes a carport and another describes internal floor area only. Check the drawings against the schedule before using either number in a construction budget or a resale brief.
Link to this answer · 03Can tenants stay in the front house during the backyard build?
Do not assume they can. Review the lease, lawful access arrangements, services, safety separation and the practical disruption with the property manager and builder. Victoria’s entry rules also cover the garden and outside areas; ownership does not provide unrestricted construction access to leased premises. Prepare an agreed occupancy and works plan, and model any vacancy that the plan requires before counting rent through the build.
Link to this answer · 04What should a front-house renovation scope include?
List the work needed for the retained home to function after the rear build: repairs, any altered parking, external walls exposed by removal work, drainage, fences, landscaping and service changes. Separate cosmetic selections from safety or permit-related work. Have the builder identify what can only be confirmed after opening up. This turns a single renovation allowance into a scope that can be checked and priced.
Link to this answer · 05Can old sheds, eaves or outbuildings simply be removed first?
Check approvals and hazardous materials before scheduling removal. Older structures can contain asbestos, including parts that look like minor works. Have the responsible contractors identify what the work may disturb and arrange appropriate assessment and removal before other trades enter the area. In the programme, show service isolation, removal, clearance where required and waste disposal as separate tasks rather than a single demolition date.
Link to this answer · 06How do we keep the front house’s services operating?
Create a service-change plan before excavation. Mark which pipes and cables serve the front home, which need relocating, and when temporary or permanent connections will be made. Assign responsibility for outage notices, trades and making good disturbed areas. Existing utility drawings help, but the actual position needs confirmation. Do not schedule a trench through the only live connection without an agreed changeover plan.
Link to this answer · 07Can we finish the front house before the rear home?
Possibly, if its access, services and required approvals can be completed independently. Finishing the paintwork does not establish that the front property can be occupied, separately sold or released from the lender’s security. Ask the builder for a safe staged works plan and the surveyor and conveyancer for the relevant completion and title requirements. Carry each dependency into the sale and cash-flow schedule.
Link to this answer · 08Should we design the rear home before deciding whether to subdivide?
Decide the intended ownership and exit arrangement early. A home kept on one title and a separately saleable lot can need different access rights, service arrangements and documentation. Ask the planner and licensed land surveyor to test the intended subdivision alongside the building concept. Designing first and solving the boundary later can require changes to parking, windows, fences, service routes or the house itself.
Link to this answer · 09What should I send DollarBuild for a retained-house project?
Send the address, title and plan if available, a survey, existing and proposed drawings, site photographs, known service information and the intended use of both homes. State whether the front home is occupied and whether separate titles are intended. Identify which documents are approved and which are sketches. We can then discuss the design and delivery scope and the investigations still needed for a written proposal.