Design and documentation
Keep the selected plan, window schedule, roof and cladding aligned in the project documentation.
Two bedrooms, two bathrooms, a 28 m² kitchen-living room with a fireplace, 2.7 m ceilings, a 21 m² garage. A plain 10 × 8 m rectangle, three interiors, two kinds of lot.
Design render — AI concept view of the fixed front, not a survey drawing
The 80 answers the same Melbourne constraints as the 92 — a 3 m driveway, a rear boundary 2 m behind the wall, a garage on the boundary, a second dwelling that still reads as a home from the shared court — inside a rectangle that ships as two identical modules.
28 m² of kitchen and living across the whole north band, 4.5 m deep, under a 2.7 m ceiling, with a 2.8 m sliding door to the garden strip.
A slim gas fireplace in a stone panel on the north wall between two windows, on axis with the entry hall.
10 × 8 m and no bay. Both bathrooms sit inside the south band, so the shell is two 10 × 4 m modules and nothing else.
The master in the south-east corner beside its ensuite; bedroom 2 in the north-west beside the entry. Nobody walks past a bedroom to reach the living room.
Open to the court and to the driveway, which is why the garage sits 1.6 m behind the façade — and why the same entry works when the garage moves.
With the truss roof, the modules travel flat-topped. Local trades fit the timber trusses, roof sheets, gutters and eave lining after the crane.



Take the bay off the 92 and put both bathrooms inside the rectangle. What is left is the house most lots can actually take.
Same shell, same corner entry. Only the garage kit and the direction you arrive from change.
The rear wall sits 2 m from the back boundary (1 m sewer easement plus 1 m buffer), the garage on the west boundary, the portico toward the shared turning court. The three court-facing windows are highlights with 1.5 m sills; the living room and the master look east onto a 4.1 m private strip.
The corner portico faces the driveway, the garage kits pair up between houses 1–2 and 3–4 with their doors to the widenings, and every house keeps a 3 m strip on the east. At 972 m² the lot stays under 1,000 m², so the canopy standard stays at 10% while garden area rises to 35%.






The plan mirrors: driveway on the east means garage east and the sliding door west, from the same drawings.
North is not fixed. The living room glazes east and north; on a north-facing street the mirror keeps the sliding door on the sunny side.
The external walls, the windows and the garage never move. Only the internal walls do.

The whole north band is one 28 m² room: an L-kitchen on the west and north walls with a 1.8 m island, the lounge at the fireplace end with the 2.8 m sliding door, a table for four by the master wall. A desk under the north window makes bedroom 2 the study.
Owner-occupiers, downsizers, premium long-term tenants
| Entry | 6.4 m² |
| Bathroom | 4.4 m² |
| Ensuite | 2.8 m² |
| Master | 12.0 m² |
| Bedroom 2 | 14.4 m² |
| Kitchen | 12.2 m² |
| Living | 15.8 m² |
| Kitchen-living (kitchen + living + dining) | 28.0 m² |
| Internal floor area, rooms only | 67.9 m² |
| Dwelling outer frame | 80.0 m² |
| Garage clear | 21.0 m² |
Twelve concept views follow the selected cladding and roof. The garage position shown is the keep-the-front development.












Twelve AI concept views from the same façade render — massing, materials and openings, not survey drawings.
Drag to look around. Choose the forecourt, the private garden or one of the three great-room layouts.
AI concept panoramas of the CC design. The outside views follow the selected roof and cladding; interiors share the same shell. These are design illustrations, not site photographs.
Garage door 1.6 m back, timber corner portico, three highlight windows under one eave, a plain 10 m wall in white weatherboard. No bay: the 80 makes its front with proportion, not projection.











3.9 × 6.4 m kit on the west boundary, front wall 1.6 m behind the façade, rear wall flush with the house, matte charcoal sectional door 2.75 × 2.1 m.
1.7 × 1.3 m, open south and west, vertical timber boards on walls and soffit, slim timber posts, a timber door with a glass sidelight. 2.2 m² covered.
Three horizontal windows, sills 1.5 m, heads 2.4 m — bathroom, ensuite, master. Light in, court kept private.
A plain rectangular shell, two identical modules and no bay pod. Both bathrooms stay inside the south band.
Concept roof option: a 22.5° hipped Colorbond roof in dark Monument, timber trusses, 450 mm eaves and quad gutters. The garage has its own lower hip; the covered link stays flat. Structure and drainage require project design.
The 2.8 m sliding door and a timber deck onto the 4.1 m private strip; the master window onto a screened courtyard at the front corner.
Concept roof option: a 22.5° hipped Colorbond roof in dark Monument, timber trusses, 450 mm eaves and quad gutters. The garage has its own lower hip; the covered link stays flat. Structure and drainage require project design.
Concept roof option: a 22.5° hipped Colorbond roof in dark Monument, timber trusses, 450 mm eaves and quad gutters. The garage has its own lower hip; the covered link stays flat. Structure and drainage require project design.






Matte white walls under 2.7 m ceilings, engineered oak floors, white joinery with stone-look tops, black tapware and frames, the fireplace in a stone panel. Design intent, not photographs of a built house.























Design renders — AI concept views
From the entry to the kitchen, bedrooms and garden. Select a route to see how it sits inside this plan.
Routes show connections through the concept plan. Furniture clearances and accessible circulation need detailed design.
The same shell can be studied on different ground profiles. These sketches show the questions to resolve before a foundation and entry design is chosen.
Level internal floor
Level internal floor
Level internal floor
Indicative terrain studies only. Surveyed levels, soil conditions, drainage, structure and the step-free entry route require site-specific design. The sketches do not specify a foundation system.
Two identical 10 × 4 m modules: the south one carries the entry, both bathrooms and the master; the north one carries bedroom 2, the kitchen and the living room. No pod. The garage is a flat-pack kit. With the truss roof, the modules travel flat-topped. Local trades fit the timber trusses, roof sheets, gutters and eave lining after the crane.
The joint runs along y = 4.0 m, through the kitchen-living room: a flashed roof seam, a floor cover strip, two wall junctions. Nothing structural crosses it.








| Tag | Room | Face | Size (w × h) | Sill | Note |
|---|---|---|---|---|---|
| D01 | Entry | South, in the portico | 950 × 2100 | — | Timber door with a glass sidelight, black lever handle |
| D02 | Garage | South, garage front | 2750 × 2100 | — | Sectional panel door, matte charcoal |
| D03 | Living | East | 2800 × 2400 | 0 | Double-glazed sliding door to the deck |
| W01 | Bathroom | South | 1700 × 900 | 1500 | Highlight, obscure glass |
| W02 | Ensuite | South | 1100 × 900 | 1500 | Highlight, obscure glass |
| W03 | Master | South | 2800 × 900 | 1500 | Highlight |
| W05 | Master | East | 2000 × 1500 | 900 | To the screened courtyard |
| W06 | Living | North | 900 × 1500 | 900 | East of the fireplace |
| W07 | Living | North | 900 × 1500 | 900 | West of the fireplace |
| W08 | Kitchen / study / dining | North | 1600 × 1500 | 900 | Sink window in A, study window in B, dining window in C |
| W09 | Bedroom 2 | North | 1600 × 1500 | 900 | Over the desk |
| ID | Internal | — | 820 × 2040 | — | Bathroom 720, ensuite 700; study slider 1000 glazed |
House CC-80’s 10.0 × 8.0 m envelope is drawn at exactly the 80 m² small-second-dwelling limit set by Amendment VC306 on 15 October 2026, which counts total floor area to the outside of the external walls. On the keep-the-front-house lot it can therefore be a small second dwelling — no planning permit in the General Residential Zone on a lot of 300 m² or more with one existing dwelling and no gas — but only if the measured drawings stay at 80 m² or less and no overlay or title restriction applies; the detached garage kit is an outbuilding. The Building Regulations still define a small second dwelling as 60 m² or less, so the building surveyor confirms its building pathway. Where a permit is needed, and for the four-house row, the plan was drawn to the deemed-to-comply standards of Clause 55, the Townhouse and Low-Rise Code in force since 31 March 2025. Every site is still assessed individually; nothing here is an approval.
| Standard | What it asks | How the plan answers it, Scenario 1 |
|---|---|---|
| Permit trigger | A second dwelling that is not a small second dwelling (over 80 m² since VC306) needs a planning permit. | Drawn at the 80 m² small-second-dwelling limit: with a measured 80 m² or less, a qualifying GRZ lot of 538 m² and no overlay, no planning permit; otherwise two dwellings on 538 m² assessed under Clause 55. |
| B2-3 Side and rear setbacks | Single-storey walls: at least 1 m from side and rear boundaries. | Rear wall 2.0 m (1 m easement + 1 m buffer); east wall 4.1 m. |
| B2-4 Walls on boundaries | 10 m + 25% of the remaining boundary; average 3.2 m, max 3.6 m high. | The garage is shown in the selected development layout. Its height, wall length and boundary conditions require review in the detailed design for the selected roof and the actual site. |
| B2-5 Site coverage | 65% in GRZ, 60% in NRZ. | 79 + 20 + 80 + 25 = 204 m² = 38% of 538 m². |
| Minimum garden area | 30% for a 501–650 m² lot in GRZ / NRZ; driveways and courts do not count. Mandatory. | About 224 m² of garden remains — about 42%. |
| B2-7 Tree canopy | 10% of a lot of 1,000 m² or less; one tree in the front and one in the rear setback. | 54 m²: five Type A trees = 63 m², one in the front setback; the rear tree sits at the north end of the open space because the 2 m strip is too narrow for deep soil. |
| B3-2 Parking location | Habitable windows within 1.5 m of a shared accessway: sill at 1.5 m or a 1.5 m solid fence. | Every window facing the court is a highlight with a 1.5 m sill. |
| B3-4 Entry | A ground-level door with a line of sight from the accessway, not through a garage, under 1.44 m² of cover. | The corner portico is visible from driveway and court, sits beside the garage, covers 2.2 m². |
| B3-5 Private open space | 25 m² secluded, at least 3 m wide, off a living area. | 4.1 × 10 m = 41 m² off the sliding door. |
| B3-6 Solar access | Open space set back (2 + 0.9 h) m from any wall to its north. | The strip has no wall to its north. |
| B3-7 Functional layout | Main bedroom at least 3 × 3.4 m; other bedrooms 3 × 3 m. | Master 4.0 × 3.0 m; bedroom 2 3.2 × 4.5 m clear. |
| B5-5 Waste | 1.8 m² individual bin store, 0.8 m deep, or a shared store. | 0.8 × 2.3 m store in the 1.6 m recess in front of the garage, screened from the court. |
| Clause 52.06 Car parking | One space for a two-bedroom dwelling; a single garage 3.5 × 6 m clear. | Garage 3.5 × 6.0 m clear, end-on to the driveway. |
Four dwellings on 972 m² change one number and keep another: garden area rises to 35% (lot over 650 m²) while canopy stays at 10% because the lot is under 1,000 m² — the reason the row is drawn at 17 × 57.2 m rather than a larger lot. Meeting every standard with the zone as the only permit trigger removes third-party review at VCAT under the current code; an overlay or one unmet standard brings the merits assessment back.
These notes describe what the plan was drawn to. They are not a planning assessment of any lot and not a promise that a permit will be granted.
Two identical module envelopes, one window and door schedule, one finishes list. Openings never move between plans.
PrefabSite fit for slab, clearances and services; the crane path is the first feasibility item.
Site fitOne shell for two kinds of site; one drawing set; the standards it was drawn to.
PlanningThe handbook connects the plan, materials, factory and site team around the same shell.
Keep the selected plan, window schedule, roof and cladding aligned in the project documentation.
Coordinate module joints, finishes, protection and transport around the approved project scope.
The registered building team coordinates site works, installation, inspections and handover.
Assess the actual property, development layout and complete project budget before proceeding.
Concept handbook. A proposal for a specific property sets out scope, responsibilities, approvals and costs.
It can be, on a backyard lot. Since Amendment VC306 (15 October 2026) Victoria’s small second dwelling covers up to 80 m² measured to the outside of the external walls, and House CC-80 is drawn at exactly that limit, so the measured drawings decide; the building surveyor confirms the building pathway because the Building Regulations still say 60 m². In the four-house row it is an ordinary dwelling under Clause 55.
The bay and the dressing room. Bedrooms and bathrooms are the same count; the kitchen-living room is 28 m² instead of 38; the study is a desk in bedroom 2, or the enclosed room in Plan B. Both bathrooms sit inside the rectangle, so the shell ships as two identical modules with no pod.
The court in front is a vehicle area shared with the front house. The code asks for a 1.5 m sill on habitable windows within 1.5 m of a shared accessway, so the three court-facing windows are highlights. The rooms that need the view look east.
No, deliberately. A detached kit can sit beside the house on a backyard lot or between two houses in a row, and a low covered link connects it visually to the house. If a site wants an internal door, the entry hall’s west wall is where it goes.
Two 10 × 4 m modules and a flat-pack garage kit, craned onto a pre-poured slab in about half a day. Where a crane cannot reach, the same drawings are built as a kit on site.
A for the biggest room and an island; B for a real office with a door; C for a dining room and a square lounge. We do not publish rent or price figures on this site — the proposal for a specific address carries them.
Send the address. The feasibility read tells you whether the shell fits, which scenario applies, which approval pathway the site takes and whether the crane can reach.