{
  "name": "DollarBuild building evidence checklist",
  "version": "1.0.0",
  "dateModified": "2026-10-09",
  "url": "https://dollarbuild.com.au/building-evidence-guide",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "scope": "Original editorial method only. Not a certification, price forecast, legal conclusion or government source licence.",
  "en": {
    "gates": [
      {
        "title": "Asset at the event date",
        "body": "Was the comparable a completed dwelling, operating rooming house, ordinary house or land with an approved scheme? Preserve the campaign and the dates; do not apply today’s building to yesterday’s sale."
      },
      {
        "title": "Site and proposal",
        "body": "Current title information, survey, planning information, design revision, ground investigation and services brief. Identify the reviewer for each question and the source’s coverage limits."
      },
      {
        "title": "Contracted scope",
        "body": "One row per deliverable: included, excluded with an owner, allowance with its basis, or unresolved. Link the drawing revision, specification and written clarification."
      },
      {
        "title": "Delivery interfaces",
        "body": "Factory, transport, lift, foundation and local installation have different responsibilities. Check route, site readiness, accepted product evidence and authority requirements before scheduling."
      },
      {
        "title": "Completed asset and use",
        "body": "Final plans, inspections, appropriate occupation documents, service records, equipment, defects and warranties. Rental or rooming house operation remains a separate readiness review."
      }
    ],
    "register": [
      [
        "Question",
        "The exact decision and proposal version being reviewed"
      ],
      [
        "Source",
        "Document issuer, URL or private file reference, version and date"
      ],
      [
        "Event date / collected date",
        "Separate when the event happened from when you obtained the record"
      ],
      [
        "Status",
        "Verified within scope, conditional, unresolved, or not applicable with a reason"
      ],
      [
        "Limitation",
        "Missing data, uncertain identity, different asset form or source coverage"
      ],
      [
        "Next action",
        "Responsible reviewer, required evidence and target decision"
      ]
    ]
  },
  "zh": {
    "gates": [
      {
        "title": "事件当时的资产",
        "body": "可比成交是成品住宅、运营 rooming house、普通旧房，还是带批文的土地？保留广告与日期，不把今天的建筑套进昨天的成交。"
      },
      {
        "title": "地块与方案",
        "body": "当前 title、测量、规划信息、图纸版本、地质调查与服务 brief。每项明确审查人及来源覆盖限制。"
      },
      {
        "title": "合同范围",
        "body": "每项成果单列：包含、排除且明确责任、暂定且有依据，或未解决。关联图纸版本、规格和书面澄清。"
      },
      {
        "title": "交付接口",
        "body": "工厂、运输、吊装、基础和本地安装责任不同。排期前核路线、现场就绪、产品证据及机构要求。"
      },
      {
        "title": "成品与用途",
        "body": "最终图纸、检查、适用入住文件、服务记录、设备、缺陷和warranty。出租或rooming house运营仍需独立就绪核查。"
      }
    ],
    "register": [
      [
        "问题",
        "确切决策及正在审查的方案版本"
      ],
      [
        "来源",
        "签发方、URL或私人文件索引、版本及日期"
      ],
      [
        "事件日期／采集日期",
        "区分事件什么时候发生与何时取得记录"
      ],
      [
        "状态",
        "范围内已核、有条件、未解决，或注明理由的不适用"
      ],
      [
        "限制",
        "缺失数据、身份不确定、不同资产形态或来源覆盖"
      ],
      [
        "下一步",
        "负责审查人、所需材料和目标决策"
      ]
    ]
  }
}